• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Lesson 2.6 – Check your calculations

    Home › forums › Professional Planning Engineer PPE-Support Forums › WK2- Prepare B.O.Q for Planning › Lesson 2.6 – Check your calculations › Reply To: Lesson 2.6 – Check your calculations

    July 1, 2017 at 12:19 pm #27600
    Mahmoud El Refaie
    Participant

    Dear Paulino ,

    Kindly find the attached sheet after check it and found some mistakes , you can check the difference by click over the work package total , you will find that the blank has the value equals to the difference and this is because the sheet collect also the subtotal for the pages and this makes the difference

    You can check the photos also , the attached file in this lesson which is BOQ bank contains the check sheet for reviewing the results with it

     

    Thank you ,

    Regards,

    Attachments:
    You must be logged in to view attached files.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....