• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Lesson 1.3 – Read Project B.O.Q

    Home › forums › Professional Planning Engineer PPE-Support Forums › Wk-1 How to study the project and settle the planning concept › Lesson 1.3 – Read Project B.O.Q › Reply To: Lesson 1.3 – Read Project B.O.Q

    July 1, 2017 at 11:42 am #27598
    Mahmoud El Refaie
    Participant

    Dear Engr.Wael ,

    Thank you for your effort and your presentable work

    I checked your sheet and you are totally right with the new added items , but in our sheet we don’t want to elaborate and decompose every scope of work to the activity level as you made.

    we want only to understand the project scope of work and determine every scope location , but actually you are right with your work

     

    Good work , keep going on with the same attitude during the workshop to get the maximum benefits form it

    Thank you,

    Regards,

    Mahmoud Omara

     

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....