• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Lesson 1.3 – Read Project B.O.Q

    Home › forums › Professional Planning Engineer PPE-Support Forums › Wk-1 How to study the project and settle the planning concept › Lesson 1.3 – Read Project B.O.Q › Reply To: Lesson 1.3 – Read Project B.O.Q

    May 6, 2017 at 3:17 pm #26535
    Faraz Khan
    Participant
    Mahmoud ElRefaie Omara wrote:

    It is not planning engineer responsibility to make quantity surveying for each activity , it is the quantity surveyor or technical office team responsibility not the planning engineer responsibility

    You didn’t got my point if we are doing case study here we must consider all the aspect as even the BOQ i am working with contains all the steel quantity as it will help us for planning and knowing the activity duration more precisely.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....