• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Welcome to PPE support forums

    Home › forums › Professional Planning Engineer PPE-Support Forums › Other planning discussions › Welcome to PPE support forums › Reply To: Welcome to PPE support forums

    August 9, 2017 at 10:35 am #28951
    Mahmoud El Refaie
    Participant

    Dear Engr. Marwan ,

    This error appears when primavera can’t read the data you import from excel file and may be because one of the following reasons :

    1- Project short name in excel doesn’t match the primavera project name

    2- WBS Codes are different than the project ones

    3- You entered the data type different than proper primavera data type  , data in the excel cells should be text to be read in the primavera

    please check theses steps and don’t hesitate to post again if you still have the same problem

    Best Regards  ,

    Mahmoud Omara

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....