• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Negative float

    Home › forums › Oracle Primavera Questions and Answers › Negative float › Reply To: Negative float

    June 11, 2017 at 6:57 pm #27212
    Hany Ismail, MSC, PMPHany Ismail, MSC, PMP
    Keymaster

    That is very good question. Before answering your question how to remove negative float, let me explain to you first from where the negative float comes. Primavera is an amazing software. However, it is a machine program, you give it inputs and it gives you the results based on your inputs. Accordingly, if did something wrong in your inputs the results would have some wrong values such as (negative floats). Following are the common reasons of negative floats:

    1- Start/Finish constrains that does not match with your relationships (the relationship want to push the activity to start or finish in certain date but the constrain does not allow for it).

    2- The project must finish by constrain date does not match with relationships results date.

     

    In order to remove the total float, copy your current schedule as baseline, and then remove all the constrains in your schedule and run it. You will find variance between the baseline and the current schedule, try to match them by modifying the relationships then add the constrains once they are typical.

    for more information about how to avoid negative float, please read this article:

    How to avoid negative float in primavera time schedule

    You are welcome to share your schedule with us by sending it to [email protected] and we can take a look and advice what is wrong with it.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....