• Home
  • Forums
  • Blog
  • Courses
  • Tools
  • Jobs
    Have any question?
    (00) 201277767728
    [email protected]
    RegisterLogin
    Planning Engineer Est.Planning Engineer Est.
    • Home
    • Forums
    • Blog
    • Courses
    • Tools
    • Jobs

      Reply To: Week 6-defend your case-071216

      January 22, 2017 at 7:23 am #23911
      AvatarJames Anabo
      Participant

      Hi Mr. Hany,

      The mailmerge app only works for 32-bit system. I have a 64-bit system.

      Could you provide for 64-bit system?

      Thank you

      Cart

      0

      Login with your site account

      Connect with:

      Login with Google Login with Twitter Login with LinkedIn

      Lost your password?

      Not a member yet? Register now

      Featured Courses:

      Monitoring and Controlling Using Power Bi and Primavera P6 -PMC

      Monitoring and Controlling Using Power Bi and Primavera P6 -PMC

      Microsoft Power BI is the future of business intelligence (BI). I have been studying this amazing software by Microsoft for 1 year and I successfully implemented...
      Planning Advanced Package- 3 Professional Courses and Primavera 50 Tips

      Planning Advanced Package- 3 Professional Courses and Primavera 50 Tips

      This advanced planning Package contains all the required knowledge to boost your career from junior planning engineer, site engineer with little planning and scheduling skills,...
      Data Management and Planning Reporting Skills

      Data Management and Planning Reporting Skills

      Data Management is the key success of construction projects reporting. This self-study course will teach you using a step by step case study how to...
      Planning Courses

      Follow Us:

      Copyright ©2012- 2019 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

      • Planning Courses
      • Planning Jobs
      • Planning Blog

      Login with your site account

      Connect with:

      Login with Google Login with Twitter Login with LinkedIn

      Lost your password?

      Not a member yet? Register now

      Register a new account

      Connect with:

      Login with Google Login with Twitter Login with LinkedIn

      Are you a member? Login now