• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Reply To: Lesson 2.3 – Prepare B.O.Q ( Add Ref. No & Merge Items description )

    Home › forums › Professional Planning Engineer PPE-Support Forums › WK2- Prepare B.O.Q for Planning › Lesson 2.3 – Prepare B.O.Q ( Add Ref. No & Merge Items description ) › Reply To: Lesson 2.3 – Prepare B.O.Q ( Add Ref. No & Merge Items description )

    April 13, 2022 at 9:09 am #110867
    Hany Ismail, MSC, PMPHany Ismail, MSC, PMP
    Keymaster

    Hello Engineer Muhammad,

    The best way to find out the problem is to execute the Macro step by step using F8.

    If you cannot solve this issue, please email me your file at [email protected] and I will check it out.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....