• Home
  • Forums
  • Blog
  • Courses
  • Tools
  • Jobs
    Have any question?
    (00) 201277767728
    [email protected]
    RegisterLogin
    Planning Engineer Est.
    • Home
    • Forums
    • Blog
    • Courses
    • Tools
    • Jobs

      Professional Planning Engineer (PPE)

      • Home
      • All courses
      • featured
      • Professional Planning Engineer (PPE)
      CoursesPaid Single CourseProfessional Planning Engineer (PPE)
      • Wk-1 How to study the project and settle the planning concept
        5
        • Lecture1.1
          Lesson 1.1 – Read Project Layout 11 min
        • Lecture1.2
          Lesson 1.2 – Read Project Contract 12 min
        • Lecture1.3
          Lesson 1.3 – Read Project B.O.Q 13 min
        • Lecture1.4
          Lesson 1.4 – Develop project layout and planning concept 13 min
        • Lecture1.5
          Lesson 1.5 – Project Information 05 min
      • WK2- Prepare B.O.Q for Planning
        7
        • Lecture2.1
          Lesson 2.0 – Check what was wrong in week 1 documents 10 min
        • Lecture2.2
          Lesson 2.1 – Introduction – Prepare B.O.Q for Planning 05 min
        • Lecture2.3
          Lesson 2.2 -Know how to work with excel macros in 10 MIN Only 10 min
        • Lecture2.4
          Lesson 2.3 – Prepare B.O.Q ( Add Ref. No & Merge Items description ) 31 min
        • Lecture2.5
          Lesson 2.4 – Prepare B.O.Q ( Add Div. No. & Add main Title for BOQ Items ) 34 min
        • Lecture2.6
          Lesson 2.5 – Prepare B.O.Q ( Combined all BOQ Items in one sheet ) 13 min
        • Lecture2.7
          Lesson 2.6 – Check your calculations 26 min
      • Wk3- Planning in Excel
        5
        • Lecture3.1
          Lesson 3.1 – Develop project activities bank 12 min
        • Lecture3.2
          Lesson 3.2 – Develop project Productivity bank 12 min
        • Lecture3.3
          Lesson 3.3 – Assign activities and Productivity to BOQ Items 44 min
        • Lecture3.4
          Lesson 3.4 – Create project schedule WBS in Excel and import to Primavera 28 min
        • Lecture3.5
          Lesson 3.5 – Create project data loading in excel 17 min
      • WK4- Planning in Primavera
        5
        • Lecture4.1
          Lesson 4.1 Create project schedule in excel ready for primavera import 01 hour 06 min
        • Lecture4.2
          Lesson 4.2 Import activities with relationships from excel to primavera part 1 01 hour 35 min
        • Lecture4.3
          Lesson 4.2 Import activities with relationships from excel to primavera part 2 01 hour 20 min
        • Lecture4.4
          Lesson 4.3 Import activities cost and resources from excel to primavera 35 min
        • Lecture4.5
          Lesson 4.4 Import Materials, Shop Drawings activities, and learn how to link activities in Excel 58 min
      • WK5- Monitor the project progress, project resources, and productivity
        2
        • Lecture5.1
          Lesson 5.1 Finalize the project schedule in P6 and Perform resource leveling 01 hour 06 min
        • Lecture5.2
          Lesson 5.2 Develop Project Mini-Schedules for Monitoring Progress and Resources 30 min
      • Wk6- Controlling the project
        4
        • Lecture6.1
          Lesson 6.1 Understand the concept of successful controlling 15 min
        • Lecture6.2
          Lesson 6.2 Recap on Mini-Schedules and how to connect excel to external data source 08 min
        • Lecture6.3
          Lesson 6.3 Receive your first update data 12 min
        • Lecture6.4
          Lesson 6.4 How to use our special mobile application 30 min
      • Wk7- Project reporting
        3
        • Lecture7.1
          Lesson 7.1 How to use the power of excel in reporting 10 min
        • Lecture7.2
          Lesson 7.2 Prepare your data and report project progress 39 min
        • Lecture7.3
          Lesson 7.3 How to do any custom report 29 min
      • WK8- Re-Planning
        4
        • Lecture8.1
          Lesson 8.1 Replanning 08 min
        • Lecture8.2
          Lesson 8.2 Develop Recovery Schedule 14 min
        • Lecture8.3
          Lesson 8.3 Develop Revised Schedule 13 min
        • Lecture8.4
          Lesson 8.4 Power BI and online reports 21 min
      • Sample Real Projects
        1
        • Lecture9.1
          14 Detailed Project Sample XER File+PDF
      • Completion Certificate
        1
        • Lecture10.1
          PPE- Completion Certificate 30 min
        This content is protected, please login and enroll course to view this content!
        Prev Lesson 6.4 How to use our special mobile application
        Next Lesson 7.2 Prepare your data and report project progress

        Leave A Reply Cancel reply

        You must be logged in to post a comment.

        Follow Us:

        About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

        Copyright ©2012- 2020 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

        • Planning Courses
        • Planning Jobs
        • Planning Blog

        Login with your site account

        Lost your password?

        Not a member yet? Register now

        Register a new account

        Are you a member? Login now

        Modal title

        Message modal