• Home
  • Forums
  • Blog
  • Courses
  • Tools
  • Jobs
    Have any question?
    (00) 201277767728
    [email protected]
    RegisterLogin
    Planning Engineer Est.Planning Engineer Est.
    • Home
    • Forums
    • Blog
    • Courses
    • Tools
    • Jobs

      Professional Planning Engineer (PPE)

      • Home
      • All courses
      • featured
      • Professional Planning Engineer (PPE)
      CoursesPaid Single CourseProfessional Planning Engineer (PPE)
      • Wk-1 How to study the project and settle the planning concept 5

        • Lecture1.1
          Lesson 1.1 – Read Project Layout 11 min
        • Lecture1.2
          Lesson 1.2 – Read Project Contract 12 min
        • Lecture1.3
          Lesson 1.3 – Read Project B.O.Q 13 min
        • Lecture1.4
          Lesson 1.4 – Develop project layout and planning concept 13 min
        • Lecture1.5
          Lesson 1.5 – Project Information 05 min
      • WK2- Prepare B.O.Q for Planning 7

        • Lecture2.1
          Lesson 2.0 – Check what was wrong in week 1 documents 10 min
        • Lecture2.2
          Lesson 2.1 – Introduction – Prepare B.O.Q for Planning 05 min
        • Lecture2.3
          Lesson 2.2 -Know how to work with excel macros in 10 MIN Only 10 min
        • Lecture2.4
          Lesson 2.3 – Prepare B.O.Q ( Add Ref. No & Merge Items description ) 31 min
        • Lecture2.5
          Lesson 2.4 – Prepare B.O.Q ( Add Div. No. & Add main Title for BOQ Items ) 34 min
        • Lecture2.6
          Lesson 2.5 – Prepare B.O.Q ( Combined all BOQ Items in one sheet ) 13 min
        • Lecture2.7
          Lesson 2.6 – Check your calculations 26 min
      • Wk3- Planning in Excel 5

        • Lecture3.1
          Lesson 3.1 – Develop project activities bank 12 min
        • Lecture3.2
          Lesson 3.2 – Develop project Productivity bank 12 min
        • Lecture3.3
          Lesson 3.3 – Assign activities and Productivity to BOQ Items 44 min
        • Lecture3.4
          Lesson 3.4 – Create project schedule WBS in Excel and import to Primavera 28 min
        • Lecture3.5
          Lesson 3.5 – Create project data loading in excel 17 min
      • WK4- Planning in Primavera 5

        • Lecture4.1
          Lesson 4.1 Create project schedule in excel ready for primavera import 01 hour 06 min
        • Lecture4.2
          Lesson 4.2 Import activities with relationships from excel to primavera part 1 01 hour 35 min
        • Lecture4.3
          Lesson 4.2 Import activities with relationships from excel to primavera part 2 01 hour 20 min
        • Lecture4.4
          Lesson 4.3 Import activities cost and resources from excel to primavera 35 min
        • Lecture4.5
          Lesson 4.4 Import Materials, Shop Drawings activities, and learn how to link activities in Excel 58 min
      • WK5- Monitor the project progress, project resources, and productivity 2

        • Lecture5.1
          Lesson 5.1 Finalize the project schedule in P6 and Perform resource leveling 01 hour 06 min
        • Lecture5.2
          Lesson 5.2 Develop Project Mini-Schedules for Monitoring Progress and Resources 30 min
      • Wk6- Controlling the project 4

        • Lecture6.1
          Lesson 6.1 Understand the concept of successful controlling 15 min
        • Lecture6.2
          Lesson 6.2 Recap on Mini-Schedules and how to connect excel to external data source 08 min
        • Lecture6.3
          Lesson 6.3 Receive your first update data 12 min
        • Lecture6.4
          Lesson 6.4 How to use our special mobile application 30 min
      • Wk7- Project reporting 3

        • Lecture7.1
          Lesson 7.1 How to use the power of excel in reporting 10 min
        • Lecture7.2
          Lesson 7.2 Prepare your data and report project progress 39 min
        • Lecture7.3
          Lesson 7.3 How to do any custom report 29 min
      • WK8- Re-Planning 4

        • Lecture8.1
          Lesson 8.1 Replanning 08 min
        • Lecture8.2
          Lesson 8.2 Develop Recovery Schedule 14 min
        • Lecture8.3
          Lesson 8.3 Develop Revised Schedule 13 min
        • Lecture8.4
          Lesson 8.4 Power BI and online reports 21 min
      • Sample Real Projects 1

        • Lecture9.1
          14 Detailed Project Sample XER File+PDF
      • Completion Certificate 1

        • Lecture10.1
          PPE- Completion Certificate 30 min
        This content is protected, please login and enroll course to view this content!
        Prev Lesson 2.3 – Prepare B.O.Q ( Add Ref. No & Merge Items description )
        Next Lesson 2.5 – Prepare B.O.Q ( Combined all BOQ Items in one sheet )

          2 Comments

        1. Avatar
          Ahmed Zakaria
          November 13, 2020
          Log in to Reply

          the latest sheet don’t assigned any orders come from macro , i try to assign this macro to this individual sheet and it works but at all it dosen’t work well , some sheets show the div no as 0

          • Hany Ismail, MSC, PMP
            Hany Ismail, MSC, PMP
            November 15, 2020
            Log in to Reply

            Please send your issue along with some screenshots and the excel file used to [email protected]

        Leave A Reply Cancel reply

        You must be logged in to post a comment.

        Follow Us:

        About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

        Copyright ©2012- 2020 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

        • Planning Courses
        • Planning Jobs
        • Planning Blog

        Login with your site account

        Lost your password?

        Not a member yet? Register now

        Register a new account

        Are you a member? Login now

        Modal title

        Message modal