Professional Planning Engineer (PPE) 12 Sections39 LessonsLifetime
Curriculum
- 12 Sections
- 39 Lessons
- Lifetime
Expand all sectionsCollapse all sections
- Wk-1 How to study the project and settle the planning concept5 Items
- WK2- Prepare B.O.Q for Planning7 Items
- 3.1Check what was wrong in week 1 documents10 Minutes
- 3.2Introduction – Prepare B.O.Q for Planning5 Minutes
- 3.3Know how to work with excel macros in 10 MIN Only10 Minutes
- 3.4Prepare B.O.Q ( Add Ref. No & Merge Items description )31 Minutes
- 3.5Prepare B.O.Q ( Add Div. No. & Add main Title for BOQ Items )34 Minutes
- 3.6Prepare B.O.Q ( Combined all BOQ Items in one sheet )13 Minutes
- 3.7Check your calculations26 Minutes
- Wk3- Planning in Excel5 Items
- WK4- Planning in Primavera5 Items
- 5.1Create project schedule in excel ready for primavera import66 Minutes
- 5.2Import activities with relationships from excel to primavera part 195 Minutes
- 5.3Import activities with relationships from excel to primavera part 280 Minutes
- 5.4Import activities cost and resources from excel to primavera35 Minutes
- 5.5Import Materials, Shop Drawings activities, and learn how to link activities in Excel58 Minutes
- WK5- Monitor the project progress, project resources, and productivity2 Items
- Wk6- Controlling the project3 Items
- Wk7- Project reporting3 Items
- WK8- Re-Planning4 Items
- Sample Real Projects1 Item
- Completion Certificate1 Item
- Share success and leave a review1 Item
- Support Articles Based on your Requests1 Item
This course has a WhatsApp support groupEnroll in the course to get the invitation link. Already enrolled? Log in to get the link.
Enroll to joinRead Project Layout
Lesson:
This is the first lesson in our workshop. Please watch the lesson video below:
Attachments:
Lesson input documents: Future_City_Layout-Model
Lesson output document:Lesson-1.1-Output-Document
Assignment:
Have questions or concerns? Ask in the course WhatsApp support group — the invitation link is at the top of this lesson.
Leave A Reply Cancel reply
You must be logged in to post a comment.
Read Project Contract
Next 
14 Comments
this is a good start to a new level especially for fresh grades
keep going
Understood about layout input and output documents. Easy to understand. Simple language. Thanks
Good start…but very complex
the attched document is not downloading sir please help me
Dear Sir,
The attached files in supporting the lessons are not downloading , can you please advise?
Best regards,
Ahmad
Hello Engineer,
You just need to click the small arrow near to downloaded file in your browser and click keep files. Anyway i have changed the upload format to zip so you will not face this problem anymore.
I revisited the training as I enjoy every second of it.
This is an interesting learning subject.
Hi Hany. I have one general question. The technique which we follow here is common to do all unique type of projects or only construction projects. Because I am working with one of the maintenance Boiler projects which is purely mechanical oriented. So for the same can I follow the same technique to define the project and proceed with other steps too. Or what should I modify ? can u please tell me elaborately. ?
MY OUTPUT DOCUMENT FOR SCOPE OF WORK WILL BE AS FOLLOWS:
1. RESIDENTIAL BUILDING
1.1 APARTMENTS
1.2 VILLAS
2. RECREATIONAL BUILDING
3. STAFF BUILDING
4. SECURITY BUILDING
5. UTILITY BUILDING
6. POOLS
6.1 MAIN POOL
6.2 SECONDARY & CHILDREN POOL
i’m thrilled to take a huge step in my career as a planning engineer, I believe PPE by Dr. Hani Ismail is the main core of planning engineer content in middle eastern region. looking forward to get to know more about planning to reach a new level on my career.
Good start
Really nice session for Project Control and Planning Engineers
this is a good start to a new level especially.