Have any question?
(00) 201277767728
[email protected]
RegisterLogin
Planning Engineer Est.Planning Engineer Est.
  • Start Here!
  • Home
  • Forums
  • Blog
  • Courses
  • Tools
      • Cart

        0

    Advanced Planning

    • Home
    • All courses
    • Advanced Planning
    • Planning Advanced Package- 3 Professional Courses and Primavera 50 Tips
    Planning Engineer Training-Online Oracle Primavera p6 Training CoursesAdvanced PlanningPlanning Advanced Package- 3 Professional Courses and Primavera 50 Tips
    • Oracle Primavera Top 50 Tips and Tricks- 50 downloadable videos 1

      • Lecture1.1
        Oracle Primavera Top 50 Tips and Tricks Download link – Copy – Copy 06 hour 40 min
    • Professional Planning Engineer (PPE) – Online Workshop 36

      • Lecture2.1
        Lesson 1.1 – Read Project Layout – Copy 11 min
      • Lecture2.2
        Lesson 1.2 – Read Project Contract – Copy 12 min
      • Lecture2.3
        Lesson 1.3 – Read Project B.O.Q – Copy 13 min
      • Lecture2.4
        Lesson 1.4 – Develop project layout and planning concept – Copy 13 min
      • Lecture2.5
        Lesson 1.5 – Project Information – Copy 05 min
      • Lecture2.6
        Lesson 2.0 – Check what was wrong in week 1 documents – Copy 10 min
      • Lecture2.7
        Lesson 2.1 – Introduction – Prepare B.O.Q for Planning – Copy 05 min
      • Lecture2.8
        Lesson 2.2 -Know how to work with excel macros in 10 MIN Only – Copy 10 min
      • Lecture2.9
        Lesson 2.3 – Prepare B.O.Q ( Add Ref. No & Merge Items description ) – Copy 31 min
      • Lecture2.10
        Lesson 2.4 – Prepare B.O.Q ( Add Div. No. & Add main Title for BOQ Items ) – Copy 34 min
      • Lecture2.11
        Lesson 2.5 – Prepare B.O.Q ( Combined all BOQ Items in one sheet ) – Copy 13 min
      • Lecture2.12
        Lesson 2.6 – Check your calculations – Copy 26 min
      • Lecture2.13
        Lesson 3.1 – Develop project activities bank – Copy 12 min
      • Lecture2.14
        Lesson 3.2 – Develop project Productivity bank – Copy 12 min
      • Lecture2.15
        Lesson 3.3 – Assign activities and Productivity to BOQ Items – Copy 44 min
      • Lecture2.16
        Lesson 3.4 – Create project schedule WBS in Excel and import to Primavera – Copy 28 min
      • Lecture2.17
        Lesson 3.5 – Create project data loading in excel – Copy 17 min
      • Lecture2.18
        Lesson 4.1 Create project schedule in excel ready for primavera import – Copy 01 hour 06 min
      • Lecture2.19
        Lesson 4.2 Import activities with relationships from excel to primavera part 1 – Copy 01 hour 35 min
      • Lecture2.20
        Lesson 4.2 Import activities with relationships from excel to primavera part 2 – Copy 01 hour 20 min
      • Lecture2.21
        Lesson 4.3 Import activities cost and resources from excel to primavera – Copy 35 min
      • Lecture2.22
        Lesson 4.4 Import Materials, Shop Drawings activities, and learn how to link activities in Excel – Copy 58 min
      • Lecture2.23
        Lesson 5.1 Finalize the project schedule in P6 and Perform resource leveling – Copy 01 hour 06 min
      • Lecture2.24
        Lesson 5.2 Develop Project Mini-Schedules for Monitoring Progress and Resources – Copy 30 min
      • Lecture2.25
        Lesson 6.1 Understand the concept of successful controlling – Copy 15 min
      • Lecture2.26
        Lesson 6.2 Recap on Mini-Schedules and how to connect excel to external data source – Copy 08 min
      • Lecture2.27
        Lesson 6.3 Receive your first update data – Copy 12 min
      • Lecture2.28
        Lesson 6.4 How to use our special mobile application – Copy 30 min
      • Lecture2.29
        Lesson 7.1 How to use the power of excel in reporting – Copy 10 min
      • Lecture2.30
        Lesson 7.2 Prepare your data and report project progress – Copy 39 min
      • Lecture2.31
        Lesson 7.3 How to do any custom report – Copy 29 min
      • Lecture2.32
        Lesson 8.1 Replanning – Copy 08 min
      • Lecture2.33
        Lesson 8.2 Develop Recovery Schedule – Copy 14 min
      • Lecture2.34
        Lesson 8.3 Develop Revised Schedule – Copy 13 min
      • Lecture2.35
        Lesson 8.4 Power BI and online reports – Copy 21 min
      • Lecture2.36
        PPE- Completion Certificate – Copy 30 min
    • Data Management and Planning Reporting Skills 17

      • Lecture3.1
        Reporting 1.1-What you will learn – Copy 05 min
      • Lecture3.2
        Reporting 1.2-What Are Construction Project Data – Copy 05 min
      • Lecture3.3
        Reporting 1.3-Why we Need to Manage Project Data – Copy 12 min
      • Lecture3.4
        Reporting 1.4-Excel DataBase Concept to Store Data – Copy 45 min
      • Lecture3.5
        Reporting 2.1-Good and Bad Database – Copy 10 min
      • Lecture3.6
        Reporting 2.2-Understand Case Study Project Data – Copy 13 min
      • Lecture3.7
        Reporting 2.3-Convert Columns To Rows part 1 – Copy 12 min
      • Lecture3.8
        Reporting 2.3-Convert Columns To Rows part 2 – Copy 13 min
      • Lecture3.9
        Reporting 2.4-Develop Project DataBase – Copy 45 min
      • Lecture3.10
        Reporting 2.5-Test Project DataBase – Copy 12 min
      • Lecture3.11
        Reporting 3.1-Report 1 part 1 – Copy 28 min
      • Lecture3.12
        Reporting 3.1-Report 1 part 2 – Copy 01 hour
      • Lecture3.13
        Reporting 3.2-Report No. 2 – Copy 32 min
      • Lecture3.14
        Reporting 3.3-Report No. 3 – Copy 06 min
      • Lecture3.15
        Reporting 3.4-Report No. 4 – Copy 10 min
      • Lecture3.16
        Reporting 3.5-Report No. 5 – Copy 13 min
      • Lecture3.17
        Reporting 3.6-Report No. 6 – Copy 22 min
      • Lecture3.18
        Reporting 4-Download Your Certificate – Copy 01 min
    • Claims Management, Extension of Time (EOT) and Delays Analysis-Online Workshop 18

      • Lecture4.1
        Lesson 1 – concept of claims – Copy 32 min
      • Lecture4.2
        Lesson 1- Quiz – Copy
      • Lecture4.3
        Lesson 2- Find the Events – Copy 30 min
      • Lecture4.4
        Lesson 2- Quiz. – Copy
      • Lecture4.5
        Lesson 3- Collect and record supporting documents – Copy 30 min
      • Lecture4.6
        Lesson 3- Quiz – Copy
      • Lecture4.7
        Lesson 4-Analyze the delays – Copy 36 min
      • Lecture4.8
        Lesson 4- Quiz – Copy
      • Lecture4.9
        Lesson 5-Build your case – Copy 52 min
      • Lecture4.10
        Lesson 5- Quiz – Copy
      • Lecture4.11
        Lesson 6-defend your case – Copy 45 min
      • Lecture4.12
        Lesson 6- Quiz – Copy
      • Lecture4.13
        Lesson 7-Time Impact window delay analysis Technique – Copy 16 min
      • Lecture4.14
        Lesson 7- Quiz – Copy
      • Lecture4.15
        Lesson 8 – Contracts Module – Copy 35 min
      • Lecture4.16
        Lesson 8- Quiz – Copy
      • Lecture4.17
        Print Your Certificate – Copy
      • Lecture4.18
        Continuous Improvement – Join our claims community – Copy
      This content is protected, please login and enroll course to view this content!
      Prev Reporting 3.5-Report No. 5 – Copy
      Next Reporting 4-Download Your Certificate – Copy

        1 Comment

      1. Ahmed Shalan
        October 14, 2018
        Log in to Reply

        افضل كورس ممكن تدرسوا في علم اداره المشروعات العملاقه والمعقدة لانه ببساطه كورس عملى النخاع وبيختصر سنين عمر طويله من الخبره المهندس هانى اسماعيل الرائع بيقدمهالك على طبق من دهب أنا أقترح الكورس دا على اي مهندس يعمل في مجال الإنشاءات وبقوه فعلا الله يباركلك يا احسن مهندس

      Leave A Reply Cancel reply

      You must be logged in to post a comment.

      Connect with:

      Login with Facebook Login with Google Login with Twitter Login with LinkedIn

      Your Cart

      All Courses

      • Advanced Planning
      • Basic Planning
      • featured
      • Microsoft Excel
      • Others

      Latest Courses

      Monitoring and Controlling Using Power Bi and Primavera P6 -PMC

      Monitoring and Controlling Using Power Bi and Primavera P6 -PMC

      $300.00
      Planning Advanced Package- 3 Professional Courses and Primavera 50 Tips

      Planning Advanced Package- 3 Professional Courses and Primavera 50 Tips

      $500.00
      Data Management and Planning Reporting Skills

      Data Management and Planning Reporting Skills

      $200.00
      logo-eduma-the-best-lms-wordpress-theme

      Planning Engineer Est.

      (00) 201277767728

      [email protected]

      Follow us:

      Company

      • About Us
      • Contact Us
      • Terms of Service
      • Privacy Policy
      • Refund Policy

      Get our Featured Content

      Copyright ©2012- 2019 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

      • Primavera p6 Training
      • Planning Tools
      • Planning Blog