Have any question?
(00) 201277767728
[email protected]
RegisterLogin
Planning Engineer Est.Planning Engineer Est.
  • Start Here!
  • Home
  • Forums
  • Blog
  • Courses
  • Tools
      • Cart

        0

    Basic Planning

    • Home
    • All courses
    • Basic Planning
    • Primavera Online Basic Course
    Planning Engineer Training-Online Oracle Primavera p6 Training CoursesBasic PlanningPrimavera Online Basic Course
    • Introduction 3

      • Lecture1.1
        Main skills 03 min
      • Lecture1.2
        Planning Engineer Responsibilities 03 min
      • Lecture1.3
        Planning Main Skills 13 min
    • The content of project management plan 7

      • Lecture2.1
        How to read and understand Primavera Time Schedule 1 10 min
      • Lecture2.2
        How to read and understand Primavera Time Schedule 2 05 min
      • Lecture2.3
        How to read and understand Primavera Time Schedule 3 05 min
      • Lecture2.4
        Project Cash flow and Manpower Histogram 05 min
      • Lecture2.5
        Shop Drawings Tracking Log 03 min
      • Lecture2.6
        Materials Procurement Tracking Log 03 min
      • Lecture2.7
        Weekly / Monthly Reports 04 min
      • Lecture2.8
        project management plan 28 min
    • Excel Fundamentals for Planning Engineers 2

      • Lecture3.1
        Excel Fundamentals for Planning Engineers 33 min
      • Lecture3.2
        Create Activity List with what you learned 22 min
    • Oracle Primavera Fundamentals 1

      • Lecture4.1
        Primavera Step by Step Download and Setup 30 min
    • Create Activity List and Cost Loading 1

      • Lecture5.1
        Create Activity List and Cost Loading 30 min
    • Create schedule Time Frame in Primavera 5

      • Lecture6.1
        Create WBS and Activity codes in primavera 40 min
      • Lecture6.2
        Import activity list from Excel to Primavera 26 min
      • Lecture6.3
        Estimate the activities duration in Primavera 08 min
      • Lecture6.4
        Link Activities and define activities relationships in Primavera 27 min
      • Lecture6.5
        Add the cost to each activity in the schedule 08 min
    • Add-shop-drawings-and-materials-time-schedule 4

      • Lecture7.1
        Common mistake in importing budget cost from excel 08 min
      • Lecture7.2
        Add shop drawings to the time schedule 28 min
      • Lecture7.3
        Add materials submittals, approvals, procurement and link them to activities 25 min
      • Lecture7.4
        Create shop drawing -and- procurement tracking log 20 min
    • Estimate Manpower - Manpower loading Sheet 4

      • Lecture8.1
        Estimate the Manpower 10 min
      • Lecture8.2
        Create resource loading sheet on excel 09 min
      • Lecture8.3
        Standard Labor Productivity rates 07 min
      • Lecture8.4
        How to import Manpower from Excel to primavera 25 min
    • Review a Primavera Time Schedule 1

      • Lecture9.1
        How to review a primavera time schedule for contractor and client 24 min
    • Create Cash Flow and Manpower Histogram 2

      • Lecture10.1
        How to create Cash Flow 20 min
      • Lecture10.2
        How to create Man Power Histogram 10 min
    • Create baseline, Payment Certificate and update the schedule 1

      • Lecture11.1
        Create baseline, Payment Certificate and update the schedule 44 min
    • Photoshop for Planning Engineers 1

      • Lecture12.1
        Photoshop for Planning Engineers 10 min
    • Samples of Projects, templates and reports 1

      • Lecture13.1
        Project templates and reports 02 min
    • Installing and Managing Primavera P6 DataBases 1

      • Lecture14.1
        Installing and Managing Primavera P6 DataBases 09 min
    • Completion Certificate 1

      • Lecture15.1
        Print Primavera Course-Basics Certificate
      This content is protected, please login and enroll course to view this content!
      Prev Add materials submittals, approvals, procurement and link them to activities
      Next Estimate the Manpower

      Your Cart

      All Courses

      • Advanced Planning
      • Basic Planning
      • featured
      • Microsoft Excel
      • Others

      Latest Courses

      Monitoring and Controlling Using Power Bi and Primavera P6 -PMC

      Monitoring and Controlling Using Power Bi and Primavera P6 -PMC

      $300.00
      Planning Advanced Package- 3 Professional Courses and Primavera 50 Tips

      Planning Advanced Package- 3 Professional Courses and Primavera 50 Tips

      $500.00
      Data Management and Planning Reporting Skills

      Data Management and Planning Reporting Skills

      $200.00
      logo-eduma-the-best-lms-wordpress-theme

      Planning Engineer Est.

      (00) 201277767728

      [email protected]

      Follow us:

      Company

      • About Us
      • Contact Us
      • Terms of Service
      • Privacy Policy
      • Refund Policy

      Get our Featured Content

      Copyright ©2012- 2019 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

      • Primavera p6 Training
      • Planning Tools
      • Planning Blog