• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Project Management

    • Home
    • Blog
    • Project Management
    • Construction Project Cost Estimation Technique

    Construction Project Cost Estimation Technique

    • Posted by Hany Ismail, MSC, PMP
    • Categories Project Management
    • Date May 16, 2014
    • Comments 1 comment

    Project case study

    The project subject to this week discussion is a construction of commercial building. The organization has a historical data for such projects. However, the original cost estimation for the previous project has errors which shown in cost overrun. From my experience, bidding on construction projects usually associated with Bill Of Quantities (B.O.Q) provided by the client which indicate the project activities along with contractual quantities.

    What are the cost estimation techniques?

    Reference to (Project Management Institute, 2008, p169), there are nine tools and techniques used to estimate the cost. (Sanghera 2010) discussed these tools as per the following:

    1- Expert judgment: this technique usually used as a part of other one. For example, expert judgment could recommend the percentage should be used as a contingency reserve. However, expert judgment could be used to estimate the whole cost of an activity whenever there is no enough information.

    2- Analogous estimating: this method uses the historical date for old projects executed to estimate the cost for similar new projects. The historical data used on this method is not detailed, such as project square meter cost or task cost without breakdown of the task components.

    3- Parametric estimating: this is a technique that use some parametric and information from historical data such as unit rate and actual quantities, which can be applied for similar projects with higher rate of accuracy.

    4-Bottom-up estimating: this technique involves the estimation of the activity components and parts costs to calculate overall cost for the activities and accordingly the project.

    5- Three-point estimates: this technique is used to increase the accuracy of tasks estimation where there is limited information. It is common to estimate tasks duration with this technique, however, it is applies in cost estimate as well.

    6- Reserve analysis: This technique adds some additional units (money, labor, time, etc.) to the calculated units to reduce the risks associated with this task.

    7- Cost of quality: this is the cost of: “implementing conformance to the requirements” and avoid additional cost and rework due to poor quality.

    8- Project management estimating software: this is not a technique by itself. Project management software could help to facilitate the time and increase the accuracy of estimating quantities to be implemented in a technique such as Bottom-up estimating.

    9- Vendor bid analysis: I would call this technique “get the information from the source.” It is common used in construction projects to contact the vendors of main tasks involves on the project during the bidding stage to get a quotation of the latest prices.

    Which cost estimation technique?

    I would choose a combination between parametric estimating and vendor bid analysis techniques. For this stage of the project “bidding”, it is not feasible to perform very detailed calculations where most likely there are time and cost restrictions. For the equipment’s and main items, I would use the vendor bid analysis technique to collect accurate prices from the source. For other activities, I would use the historical actual rate per unit and apply these rates to the new project B.O.Q.

    Advantages and disadvantages of your chosen technique

    Advantages:

    • Acceptable accuracy for the project stage “bidding”.
    • Less time and cost to finish the cost estimation comparing to bottom-up estimating.
    • This estimation could be used as a starting document in planning process group if the project awarded to the company.
    • Could reduce the risks by adding Risk Analysis and Contingency (Hollmann 2009)

    Disadvantages:

    • Vendor’s response time not in full control to fulfill the bidding date.
    • If the contract is a lump sum contract, any mistakes in the B.O.Q quantities could affect the project-estimated costs (negative or positive).
    • If the historical data is not accurate, this could lead to wrong cost estimation.

       

    References:

    HOLLMANN, J.K., 2009. Recommended Practices for Risk Analysis and Cost Contingency Estimating. AACE International Transactions, , pp. RISK.01.1-RISK.01.14.

    PROJECT MANAGEMENT INSTITUTE, 2008. A guide to the project management body of knowledge (PMBOK guide). 4th edn. Newtown Square, Pa.: Project Management Institute.

    SANGHERA, P., 2010. PMP in depth, second edition : project management professional study guide for the PMP exam / Paul Sanghera. Australia ; Course Technology/Cengage Learning, 2010; 2nd ed.

     

    Tag:cost estimation, cost estimation technique, Project case study

    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    Installing and Managing Primavera P6 Database
    May 16, 2014

    Next post

    Which is cheaper, cost of quality or cost of poor quality?
    May 18, 2014

    You may also like

    2022-06-28_13-53-15
    Variation Orders and EOT
    29 June, 2022
    img_0142.jpg
    How to perform Cost Control in Construction Projects
    29 September, 2020
    getty_506903004_200013332000928076_348061
    How to change Your Career to a Planning Engineer
    10 December, 2019

      1 Comment

    1. blank
      Olayinka228
      December 17, 2015
      Log in to Reply

      Thank you for all these informations!Its value is more than what I paid for being a premium member.

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....