• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Job Region: Qatar

    • Home
    Showing 1-10 of 395 results
    PlanningJobs

    planning engineer is require

    • Posted by PlanningJobs
    June 6, 2022
    0

    We are looking for candidates who have good experience within Oil & Gas environment dealing with EPIC (Onshore/ Offshore) projects.                                          …

    Read More
    PlanningJobs

    sr planning engineer is require

    • Posted by PlanningJobs
    May 25, 2022
    0

    Hiring – Sr Planning Engineer Oil &Gas – QATAR Education: Recognized B. Tech/B Sc Engg degree in Engineering (Mechanical). Experience:  10 To 12 years , in the Oil & Gas related experience in GCC. Preference to local candidate ( If …

    Read More
    PlanningJobs

    planning engineer is require

    • Posted by PlanningJobs
    May 25, 2022
    0

    Urgently Required – Planning Engineer B.E Mechanical Minimum 7 years planning & monitoring experience within an MEP company                                              …

    Read More
    PlanningJobs

    planning engineer is require

    • Posted by PlanningJobs
    May 10, 2022
    0

    Immediate Hiring: Planning Engineer Location: Qatar Local candidates with transferable visa is preferred Degree / Diploma in Mechanical Engineering Minimum 5 to 8 years experience in Planning for EPC projects in Oil & Gas sector Should be well versed with …

    Read More
    PlanningJobs

    planning engineer is require

    • Posted by PlanningJobs
    March 14, 2022
    0

    . PLANNING ENGINEER (3x) Requirements: – 7+ years of experience – Joinery or Stone experience is mandatory – Available to join immediately – With Valid visa & QID Duration: 3 Months – extendable

    Read More
    PlanningJobs

    planning engineer is require

    • Posted by PlanningJobs
    March 3, 2022
    0

      URGENT Open Position for Qatar Project: (1) PLANNING ENGINEER Minimum requirements: -minimum 5 years experience in MEP Projects -Primavera knowledge is a must -must be available ASAP, local applicants are preferred due to the urgency of this job.    …

    Read More
    PlanningJobs

    planning engineer is require

    • Posted by PlanningJobs
    January 25, 2022
    0

    Job Description: ·        Takes a lead in preparing schedule data for proposals or contract negotiations as requested and checks and confirms that the correct scope of work is reflected on assigned schedules. ·         Integrates inter-discipline schedule requirements and constraints to establish logical …

    Read More
    PlanningJobs

    planning engineer is require

    • Posted by PlanningJobs
    January 16, 2022
    0

    We are urgently looking to fill the following positions to work for a Main Contractor based in Doha, Qatar Senior Planning Engineer about the company: Ignite is a recruitment agency formed in 2010 with offices in the UK and Middle …

    Read More
    PlanningJobs

    planning engineer is require

    • Posted by PlanningJobs
    December 26, 2021
    0

    Job Vacancies Location: Doha, QataR -PLANNING ENGINEER Requirements: – Any nationality – Bachelor’s Degree – 8 years + experience – Experience in school projects – Immediate joiner – Valid visa & QID

    Read More
    PlanningJobs

    planning engineer is require

    • Posted by PlanningJobs
    December 15, 2021
    0

      Looking for Planning Engineer Job description : Planning : 1. Prepare time schedule, histogram and S-curves for all projects 2. Prepare recovery schedule for all projects 3. Prepare time impact due to variation issues 4. Prepare monthly report including …

    Read More
    • 1
    • 2
    • …
    • 22
    • >

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....