• Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
Have any question?
(00) 201277767728
[email protected]
RegisterLogin

Login with your site account

Lost your password?

Not a member yet? Register now

Register a new account

Are you a member? Login now

Planning Engineer Est.
  • Home
  • Blog
  • Courses
  • Tools
  • Jobs
  • Forums
      • Cart

        0

    Job Region: Bahrain

    • Home
    Showing 1-10 of 395 results
    PlanningJobs

    sr planning engineer is require

    • Posted by PlanningJobs
    June 14, 2022
    0

    We have an URGENT Requirement for following positions for a Long Term Oil & Gas project in Bahrain       Planning Engineer                                      …

    Read More
    PlanningJobs

    planning engineer is require

    • Posted by PlanningJobs
    September 7, 2021
    0

    about the company: FEW WORDS ABOUT US Al-Faisal Windows Est. is a private company categorised under trading, contracting and service provider, located in Saudi Arabia. The company took its first breath in 2009. Since then, we have grown to a …

    Read More
    PlanningJobs

    planning engineer is require.

    • Posted by PlanningJobs
    March 10, 2021
    0

    Due to securing several large marine projects in Bahrain we are looking for the right candidate for the following positions: Planning Engineers about the company: Total contracting and trading co (TCT) operates in the kingdom of bahrain as one of …

    Read More
    PlanningJobs

    Looking for a mechanical planning engineer in Bahrain

    • Posted by PlanningJobs
    February 8, 2021
    0

    about the company: Jalal Al A’Ali & Sons Co. B.S.C. (c) , JASCO in short, was registered in Bahrain in 2010 by Mr. Jalal Ahmed Mansoor Al A’Ali. JASCO is a Closed Joint Stock Company with a paid up capital …

    Read More
    PlanningJobs

    Sr Planning Engineer Required Urgently in Bahrain

    • Posted by PlanningJobs
    November 9, 2020
    0

    Sr Planning Engineer Required Urgently in Bahrain Required in Famous Construction Company in Bahrain. Candidate must have at lease 12 Years experience as Planning Engineer, in Hospital Construction Project, Must be available to join immediately. about the company: We are …

    Read More
    PlanningJobs

    planning engineer is require.

    • Posted by PlanningJobs
    June 8, 2020
    0

    Civil Contracting Company in Bahrain is looking forward to recruiting candidates for the following positions: Sr. Planning Engineer Bachelor degree in Engineering with 12 + years GCC experience, having *CRPEP license*.Good knowledge in Primavera. Experienced in preparing detailed WBS Schedule, …

    Read More
    PlanningJobs

    planning engineer is require.

    • Posted by PlanningJobs
    May 16, 2020
    0

    about the company: Founded in 1977, DSS is a part of the 1800 people strong Dynamic Group of companies a diversified conglomerate with business interests in Oil & Gas, EPC, Manufacturing & Information Technology. Over the last three decades, DSS …

    Read More
    PlanningJobs

    Civil Planning Engineer is require.

    • Posted by PlanningJobs
    March 26, 2020
    0

    about the company: An Undying Quest for Excellence Since 1963, Sayed Kadhem Al Durazi realized the growing opportunities and challenges of modernizing Bahrain’s local industries, and had early on embarked on this still relevant mission of addressing these two never …

    Read More
    PlanningJobs

    planning engineer is require.

    • Posted by PlanningJobs
    March 6, 2020
    0

    about the company: For more than 130 years, companies around the world have depended on Intertek to help ensure the quality and safety of their products, processes and systems. We go beyond testing, inspecting and certifying products; we are a …

    Read More
    PlanningJobs

    Looking for Planning Engineer

    • Posted by PlanningJobs
    February 19, 2020
    0

    Looking for Planning Engineer –(Civil/Electrical) with Substation project EPC 5-7 yrs experience. The project location Bahrain -2 nos -220 kv Substation. Candidates available in KSA and ready to move Bahrain. Candidates available in Bahrain and can join project immediately. Requirement: …

    Read More
    • 1
    • 2
    • >

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....