    • 6 Steps to create Cash Flow from Primavera without using P6 reports

    6 Steps to create Cash Flow from Primavera without using P6 reports

    • Posted by Hany Ismail, MSC, PMP
    • Categories Planning Using Primavera
    • Date October 29, 2017
    • Comments 0 comment

    In this article i will show you simple method to create cash flow from Primavera without using the cash flow report in primavera. This method is faster and it may be the only choice you have in some primavera versions where the cash flow report is missing.

    Step Number One:

    Click on resource usage spreadsheet and select the cost resource as per the photo above. This is also know as Primavera cash flow if you are using materials to load costs.

    Step Number Two:

    blank

    Right click on the cost resource and copy. Please note, you need to adjust the right columns to show the units per month/week as you prefer to see it in your cash flow.

    Step Number Three:

    blank

    Paste the values in excel sheet as you can see from the photo above.

    Step Number Four:

    blank

    Delete unnecessary columns, change the Cell A2 with (Monthly or Weekly cost), and format the cells B2 to O2 as numbers.

    Step Number Five:

    blank

    Add cumulative cash row as per the photo above.

    Step Number Six: 

    blank

    Now Select the data in cells A1 to O3 and insert chart. Make the Monthly cash as columns and Cumulative cash as line with secondary axis.

     Download the sample File: 6 Steps to create Cash Flow from Primavera without using P6 reports

    Tag:Cash Flow, Cash Flow from Primavera, p6, p6 reports, Primavera, primavera cash flow

    • Share:
    Hany Ismail, MSC, PMP
    Hany Ismail, MSC, PMP

    Hany Ismael is the founder and CEO of Planning Engineer Est. in Egypt. He has started his career back in 2003 as a site engineer, technical office engineer, planning engineer, planning manager, and finally planning department manager where he has been involved in several mega construction projects in Egypt and Saudi Arabia. In 2016, he established his own company in Egypt “Planning Engineer Est.” Hany gained his MSc degree in project management from Liverpool University-UK 2013-2016, PMP certified from PMI-USA 2010, and BSc Civil Engineer Tanta University-Egypt 2003. Hany provided more than 3,500 hours of planning and project management training on his website planningengineer.net, YouTube channel, and offline courses since 2011. He enjoys teaching project management in simple and practical way, and he developed several planning tools, techniques and courses.

    Previous post

    Why you should add the advanced payment to your schedule and how to link it?
    October 29, 2017

    Next post

    Using flag and indicators in oracle primavera to show progress
    November 8, 2017

    You may also like

    Remove Actuals using Global Change cover
    Remove Primavera P6 Actuals using Global Change
    24 January, 2022
    Bulk Delete Relationships in P6 cover
    Bulk Delete Relationships in P6
    20 January, 2022
    img_0237.png
    Primavera P6 Calendar 10 Tips and Tricks
    18 November, 2020

    Leave A Reply Cancel reply

    You must be logged in to post a comment.

    Cart

    0

    Planning Courses

    Cost Control for Construction Projects

    Cost Control for Construction Projects

    $299.00
    Power Bi Monitoring and Controlling with P6

    Power Bi Monitoring and Controlling with P6

    $299.00
    Advanced Planning 3 Courses Package

    Advanced Planning 3 Courses Package

    $499.00
    Data Management and Reporting

    Data Management and Reporting

    $199.00
    Primavera Online Basic Course -Arabic

    Primavera Online Basic Course -Arabic

    $99.00
    Professional Planning Engineer (PPE)

    Professional Planning Engineer (PPE)

    $335.00
    Claims Management and (EOT)

    Claims Management and (EOT)

    $175.00
    Primavera Online Basic Course -English

    Primavera Online Basic Course -English

    $99.00

    Follow Us:

    About Us | Contact Us | Terms of Service | Privacy Policy | Refund Policy

    Copyright ©2012- 2018 planningengineer.net | All materials, unless otherwise noted, were developed originally for Planning Engineer Website. In the event that there is still a problem or error with copyrighted material, the break of the copyright is unintentional and noncommercial and the material will be removed immediately upon presented proof.

    • Planning Courses
    • Planning Jobs
    • Planning Blog
    Posting....